GLAST LAT Integration - B-Roll
In fall of 2006, the LAT was shipped to the General Dynamics facility in Arizona for integration onto the spacecraft bus. The General Dynamics spacecraft bus provides the power, data, and pointing resources that will enable the LAT to perform its survey of the Universe. Subsequent to the mechanical integration, the command, data, and power interfaces between the instrument and the spacecraft were tested rigorously to insure the compatibility of this spaceflight hardware that had been manufactured all around the globe.
This footage shows the LAT instrument arriving on September 18, 2006.
This footage shows cleanroom footage of the GLAST satellite in 2006.
For More Information
Credits
Please give credit for this item to:
NASA/Goddard Space Flight Center
-
Scientist
- Steven Ritz (NASA/GSFC)
Release date
This page was originally published on Monday, September 17, 2007.
This page was last updated on Wednesday, May 3, 2023 at 1:55 PM EDT.
Missions
This page is related to the following missions:Series
This page can be found in the following series:Datasets used
-
[Fermi: LAT]
ID: 216Fermi Gamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT)
This dataset can be found at: http://fermi.gsfc.nasa.gov
See all pages that use this dataset -
[Fermi]
ID: 687
Note: While we identify the data sets used on this page, we do not store any further details, nor the data sets themselves on our site.