PACE Integration and Testing Footage
This is a collection of raw footage of the integration and testing of the instruments and spacecraft for the Plankton, Aerosols, Cloud, ocean Ecosystem (PACE) mission.
B-roll compilation of PACE spacecraft and instruments in various stages.
Technicians work to process the NASA’s Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) observatory on a spacecraft dolly in a high bay at the Astrotech Space Operations Facility near the agency’s Kennedy Space Center in Florida on Monday, Dec. 4, 2023.
NASA/Cory S Huston
Beauty shots of the PACE spacecraft in the cleanroom with engineers.
PACE spacecraft undergoing mass properties testing.
Beauty shots of completed PACE before ship out.
PACE enters the thermal vacuum chamber for testing.
Moving to the Electromagnetic Interference testing chamber
Beauty shots of the PACE spacecraft in the cleanroom with engineers.
B-roll of Ocean Color Instrument (OCI)
HARP2 Integration
Integration of the SPEXone instrument on the PACE spacecraft.
B-roll of SPEXone instrument at SRON in the Netherlands.
Integration of the bus assembly.
Integration of the bus assembly.
Integration of the bus assembly.
Music: Morning Coffee by Anders Johan Gregor Lewen [STIM]
Complete transcript available.
Video descriptions available.
Credits
Please give credit for this item to:
NASA's Goddard Space Flight Center
-
Producers
- Ryan Fitzgibbons (KBR Wyle Services, LLC)
- LK Ward (KBR Wyle Services, LLC)
- Michael Starobin (KBR Wyle Services, LLC)
-
Videographers
- Rob Andreoli (Advocates in Manpower Management, Inc.)
- John Caldwell (Advocates in Manpower Management, Inc.)
- Ryan Fitzgibbons (KBR Wyle Services, LLC)
- Michael Starobin (KBR Wyle Services, LLC)
-
Scientist
- Jeremy Werdell (NASA/GSFC)
-
Editor
- Ryan Fitzgibbons (KBR Wyle Services, LLC)
Release date
This page was originally published on Thursday, November 3, 2022.
This page was last updated on Monday, January 29, 2024 at 1:44 PM EST.